This project involved reorganizing and subtlely redesigning the space. The goal was to structure the space into distinct zones.
Order was achieved by separating the entry and storage areas, the director’s office, the construction engineers’ zone, and the reception. The final area was allocated for creative work by architects and designers. The orginal division into cubicles with low plasterboard walls was replaced with glass walls and an open-space layout. Thanks to these changes, the branch gained a representative character, maximized use of space, and improved working conditions.
This project involved reorganizing and subtlely redesigning the space. The goal was to structure the space into distinct zones.
Order was achieved by separating the entry and storage areas, the director’s office, the construction engineers’ zone, and the reception.
The final area was allocated for creative work by architects and designers.
The orginal division into cubicles with low plasterboard walls was replaced with glass walls and an open-space layout. Thanks to these changes, the branch gained a representative character, maximized use of space, and improved working conditions.